OEM P/N:
ESCT P/N:
PART TYPE:
OEM:
The LAM TCP Capacitor Assembly (OEM P/N 839-031687-003) is a pre-built bank of high-voltage, high-frequency power capacitors mounted on a common chassis, used within the radio-frequency (RF) impedance matching network of LAM Research Transformer Coupled Plasma (TCP) etch tools configured for 8″ (200mm) wafers. The designation “TCP MNW” identifies it as a match network (MNW) sub-assembly belonging to the transformer coupled plasma source, the inductive top-source architecture that LAM uses to generate dense, low-pressure plasmas for poly, metal and dielectric etch processing.
In a TCP source, RF energy is delivered from a generator through a coaxial feed into a matching network and then into the planar spiral TCP coil that sits above the dielectric window of the chamber. The match network exists to transform the highly reactive, plasma-dependent load impedance back to the 50 ohm system impedance the generator expects. The capacitor assembly is the heart of that transformation: it provides the tuned and load capacitance that, together with the network inductors and one or more variable vacuum capacitors, cancels the inductive reactance of the coil and the plasma and forces maximum forward power into the discharge with minimal reflected power.
Because this component carries large circulating RF currents at elevated voltage while sitting close to a continuously cycling plasma source, it is a known service item. When its capacitors drift, arc or fail, the match can no longer reach a stable tune point, and the symptoms propagate directly into etch rate, uniformity and tool uptime. Specifying the correct assembly therefore restores a TCP source to its qualified operating window.
Within the TCP match network the capacitor assembly performs several interlocking electrical jobs, all of which must hold their rated values across temperature and RF stress for the source to remain stable:
RF power capacitors used in plasma match networks are typically vacuum or low-loss ceramic (porcelain or specialised RF dielectric) types selected for tight capacitance tolerance, high voltage standoff and very low dissipation factor. The assembly groups several such capacitors on a conductive bus structure, often with mica, PTFE or ceramic stand-offs that hold spacing and creepage distance. Capacitance must remain stable as the parts self-heat under circulating current; a few percent of drift can move the tune point enough to raise reflected power and force the variable capacitors toward the ends of their travel.
At match, the current circulating through these capacitors can be many times the line current drawn from the generator, so terminations, bus straps and the chassis ground reference must be low-resistance and mechanically sound. Loose or corroded joints become localised heat sources and raise contact resistance, which both wastes power and accelerates degradation. The assembly’s mounting also defines the RF return path and stray inductance; reproducing the original geometry is what allows a replacement to drop into the existing match calibration.
Because the capacitor assembly sits directly in the RF power delivery chain, its condition is visible in nearly every etch metric the fab tracks. A degraded or out-of-tolerance assembly translates into measurable process and availability problems:
Sustained high RF voltage, contamination across stand-offs, or moisture ingress can initiate partial discharge that erodes the dielectric until a capacitor flashes over. Arcing leaves carbon tracks, pits the terminations and frequently destroys the affected capacitor outright, presenting as sudden match faults or visible burn marks inside the network enclosure.
Thermal cycling and ageing of the dielectric cause gradual capacitance shift. The match compensates by repositioning the variable capacitors, so the early signature is creeping tune positions and slowly rising reflected power rather than an outright fault, a change that is easy to miss without trend monitoring of match parameters.
Repeated RF heating and mechanical vibration loosen bus joints and ground terminations. The resulting contact resistance generates hot spots, discolours hardware and can anneal or fatigue the connection until it opens intermittently, producing erratic power delivery that is difficult to diagnose because it appears load- and temperature-dependent.
Replacement should be carried out by a qualified RF or equipment engineer following LAM-approved lockout and RF safety procedures. High-voltage capacitors can retain a hazardous charge, so the network must be powered down, isolated and discharged before any contact. The following sequence reflects good practice:
Match network components fail in ways that take an etch chamber offline immediately, so holding a verified capacitor assembly on the shelf is sound risk management for any fab running 200mm LAM TCP tools. ESCT Fab Support helps maintenance teams keep these legacy sources qualified and productive:
It provides the fixed and tuning capacitance inside the RF impedance matching network that feeds the transformer coupled plasma coil. Together with the network inductors and variable vacuum capacitors, it transforms the plasma load to 50 ohms so the generator delivers maximum forward power with minimal reflected power.
No. This item is supplied as a new, OEM-compatible part that is verified to the form, fit and function of LAM OEM P/N 839-031687-003. It is not an original LAM-branded component, and LAM Research is referenced only to identify the platform the part fits.
It is intended for the TCP match network on LAM transformer coupled plasma etch tools configured for 8″ (200mm) wafers. Because match network configurations vary by source generation, we recommend confirming applicability against the OEM part number and your specific tool configuration before ordering.
The current lead time is approximately four weeks. Planning a replacement against this lead time allows maintenance teams to schedule a preventive swap during planned downtime rather than reacting to an unexpected match failure.
Typical signs include rising reflected power, longer or unstable match settling, variable capacitors drifting toward the limits of their travel, intermittent RF or match faults, and in severe cases visible arc tracking or burning inside the network enclosure. Etch rate and uniformity drift are common downstream symptoms.
Because the part is verified to the original form, fit and function, it is designed to drop into the existing match geometry. However, after any RF component change you should bring up the source at low power, confirm the network tunes with minimal reflected power, and re-verify etch rate and uniformity against the tool baseline before returning to production.
The LAM TCP Capacitor Assembly (OEM P/N 839-031687-003, ESCT P/N ES2022-125) is a pre-built bank of high-voltage RF capacitors at the core of the impedance matching network on 8″ (200mm) LAM transformer coupled plasma etch tools. By holding stable, low-loss capacitance under heavy circulating current, it lets the match transform the plasma load to 50 ohms and deliver clean, repeatable RF power into the TCP coil. When it drifts, arcs or develops loose connections, the result is reflected power, process drift and downtime, making a verified, shelf-ready replacement a useful safeguard for fabs running these legacy platforms.
Disclaimer: This part is supplied by ESCT Fab Support as a new, OEM-compatible second-source component, verified to the form, fit and function of Lam Research part number 839-031687-003. It is not an original OEM part and is not sold as one. It is not manufactured by, endorsed by, or affiliated with Lam Research, and all manufacturer names and part numbers are quoted for identification and compatibility purposes only.
Fill out the form below to request a quote for the part/s you require, making sure to include the OEM part number.
If the part you are looking for is not listed, get in touch and we will try to source it for you through our wide network of partners and suppliers.
We use cookies We use analytics cookies to see how visitors use this site, so we can improve it. They are set only if you accept. Read our Cookie Policy.