SLIT, PRE-MRS, XR80, GRAPHITE

PART DETAILS

0020-85069
SLIT, PRE-MRS, XR80, GRAPHITE

OEM P/N: 

0020-85069

ESCT P/N: 

ES227-0551

PART TYPE:

2nd

OEM: 

AMAT
MORE INFO

Graphite pre-mass-resolving slit (OEM P/N 0020-85069), high-purity beam-defining aperture for AMAT XR80 ion implanter systems

ESCT Fab Support Replacement beamline slit, ESCT P/N ES227-0551, for Applied Materials XR80/9500-class implanter beamlines

The graphite pre-mass-resolving slit is a precision beam-defining aperture installed in the early section of the AMAT XR80 ion implanter beamline, immediately ahead of the analysing (mass-resolving) magnet. Machined from high-purity, fine-grain graphite, this component sits in the divergent ion beam after extraction and shapes the beam envelope before it enters the analyser. Its defining edges set the angular and spatial acceptance of the beam that the downstream mass-resolving optics will subsequently sort by mass-to-charge ratio.

The “PRE-MRS” designation identifies this slit as the pre-mass-resolving-slit aperture, distinct from the final resolving slit that follows the analysing magnet. In this position the slit intercepts a broad, energetic, mixed-species ion stream emerging from the source extraction optics. It must trim the beam to a well-controlled width and divergence so that the analysing magnet can disperse the species cleanly across the resolving plane. Graphite is chosen here because it tolerates direct beam strike, sublimes rather than melts under localised heating, and does not introduce metallic contamination into the implant chemistry.

Because it directly contacts a high-current, high-energy ion beam in hard vacuum, this slit is a true consumable. Edge erosion, sputter redeposition and thermal cycling progressively change its effective aperture, which in turn degrades mass resolution, beam transmission and ultimately implant uniformity. Keeping a qualified replacement on the shelf is central to sustaining beamline tune stability and protecting wafer-level dose accuracy on XR80-class tools.

Functional role of the pre-mass-resolving slit in AMAT XR80 implanter platforms

Within the XR80 beamline the pre-MRS slit performs several interlocking functions that together set the quality of the beam delivered to the wafer. It is small, passive and mechanically simple, yet it is one of the most influential apertures in the entire optical column.

  • Defines the entrance width and divergence of the ion beam presented to the analysing magnet, fixing the object size for the mass dispersion that follows.
  • Intercepts and dumps off-axis, halo and high-divergence ions before they reach the resolving plane, reducing the unwanted tails that smear mass separation.
  • Acts as a thermal and particulate beam stop for the trimmed beam fraction, absorbing the intercepted power as sublimating graphite rather than reflecting or melting.
  • Helps establish reproducible beam-current setpoints by presenting a stable, known aperture geometry to the tuning algorithm during source and beamline optimisation.
  • Contributes to vacuum cleanliness by confining sputtered material to a carbon-based, fab-compatible debris path rather than introducing metals into the implant.
  • Protects downstream optics and the analyser aperture from direct strike by the widest, most divergent portion of the extracted beam.

Material and process performance

The behaviour of this slit is governed almost entirely by its graphite substrate and the precision of its machined edges. Both must hold up to sustained beam strike while remaining dimensionally and chemically stable.

Graphite material characteristics

Fine-grain, high-purity graphite is the standard beam-contact material in AMAT source and beamline hardware because it combines a very high sublimation temperature with low sputter yield and minimal outgassing. It conducts heat away from the strike zone, withstands repeated thermal cycling without cracking under normal duty, and, critically, contributes only carbon to the residual gas and redeposition budget. Low ash content and tight grain structure keep particulate generation and metallic contamination to a minimum, which matters immediately upstream of the analysing magnet.

  • High sublimation point allows the slit to absorb direct beam power without melting or deforming.
  • Low sputter yield slows edge recession and extends usable aperture life.
  • Carbon-only debris path avoids introducing metallic species into the beamline vacuum.
  • Good thermal conductivity spreads localised heating away from the strike edge.

Aperture geometry and edge definition

The optical performance of the slit depends on the accuracy and surface finish of its defining edges. The aperture width, edge straightness and alignment to the beam axis directly determine how cleanly the beam is trimmed and how reproducibly the analysing magnet can resolve adjacent mass peaks. A worn, rounded or eroded edge widens the effective aperture and blurs the beam object, degrading resolution even when the magnet and extraction are perfectly tuned.

  • Edge straightness and aperture width set the beam object size feeding the mass dispersion.
  • Sharp, well-defined edges produce cleaner mass peaks and better species separation.
  • Correct fit and seating maintain alignment to the optical axis after replacement.
  • A controlled finish minimises micro-particle shedding into the beam path.

Impact on tool performance and yield

As a beam-defining aperture, the condition of this slit propagates directly into the implant result. A slit that has drifted out of specification through erosion or redeposition undermines the very parameters that the implanter exists to control.

  • Degraded mass resolution allows neighbouring species or charge states to bleed through, risking implant contamination and incorrect dopant profiles.
  • A widened or asymmetric aperture shifts beam current and tune setpoints, lengthening source and beamline optimisation time.
  • Particulate shedding from a deteriorated edge raises the risk of defectivity excursions and wafer-level yield loss.
  • Unstable transmission complicates dose control, threatening dose uniformity and repeatability across the wafer.
  • Recurring retuning and qualification driven by slit drift consumes beam time and reduces overall tool availability.

Common wear and failure modes

Because the slit lives in the beam, its failure modes are dominated by erosion, deposition and thermal effects rather than by mechanical or electrical fault.

Edge erosion and sputtering

Continuous strike by energetic ions slowly sputters and recesses the defining edges. Over time the aperture widens and the edges round over, blurring the beam object and softening mass resolution. This is the primary life-limiting mechanism and the usual reason a pre-MRS slit is scheduled for replacement.

Redeposition and buildup

Sputtered material and condensed source by-products can redeposit on and around the slit, partly occluding the aperture or creating flakes that later detach as particles. Asymmetric buildup skews the beam profile and can shift the tune, while liberated debris becomes a defectivity source downstream.

Thermal stress and cracking

Repeated heating and cooling as beam conditions change imposes thermal cycling on the graphite. Under high beam loads or after prolonged service, micro-cracking, flaking or fracture at the strike zone can occur, abruptly changing the aperture geometry and forcing an unplanned slit change.

Installation and replacement guidance

Replacement should follow the OEM service procedure for the specific XR80 beamline configuration and be carried out by trained personnel under appropriate vacuum, lockout and handling controls. The following sequence outlines a typical approach.

  • Place the tool in a safe service state, disable the beam and source, and follow site lockout/tagout and high-voltage safety procedures before any access.
  • Vent the relevant beamline section to the appropriate level and open the access port per the OEM maintenance instructions.
  • Handle the graphite slit only with clean, powder-free gloves to avoid oils and contamination, and inspect the new part for chips, cracks or machining debris before fitting.
  • Remove the worn slit, then clean the mounting interface and surrounding fixtures of redeposited material and flakes.
  • Install the replacement slit in the correct orientation, confirming proper seating and alignment of the aperture to the beam axis without overtightening fasteners.
  • Close the section, pump down and verify the beamline reaches base vacuum within the expected time, watching for leaks or excessive outgassing.
  • Re-establish the beam, retune the source and analyser, and qualify mass resolution, beam current and dose uniformity before returning the tool to production.

Spare parts strategy for AMAT XR80 beamline consumables

Beam-contact consumables such as the pre-MRS slit wear on a predictable cadence, so stocking qualified replacements is a straightforward way to protect uptime. ESCT Fab Support helps fabs and service teams keep XR80 beamlines productive without overcommitting to long OEM lead times.

  • Components verified to form, fit and function against the original specification for confident drop-in replacement.
  • Short, predictable lead times that support planned preventive-maintenance swaps and reduce reliance on emergency sourcing.
  • Clear OEM and ESCT cross-referencing (OEM P/N 0020-85069, ESCT P/N ES227-0551) for accurate ordering and inventory control.
  • Support for consignment and min/max stocking strategies to keep wear parts on the shelf where they are needed.
  • Specialist focus on AMAT ion implanter source and beamline hardware, backed by knowledgeable application support.

Frequently asked questions

What does the pre-mass-resolving slit actually do?

It is a graphite aperture that trims the ion beam to a defined width and divergence before the beam enters the analysing magnet. By setting the beam object size and intercepting off-axis ions, it enables the magnet to cleanly separate species by mass-to-charge ratio.

Is this an original AMAT part?

No. This is supplied as a new, OEM-compatible replacement part for AMAT P/N 0020-85069, verified to form, fit and function. It is not an original OEM part and is not sold as one; it is offered as a compatible alternative for XR80-class beamlines.

Why is the slit made from graphite rather than metal?

Graphite withstands direct beam strike by sublimating instead of melting, has a low sputter yield, and contributes only carbon to the vacuum environment. A metallic slit in this position would risk introducing metal contamination into the implant and would tolerate beam heating far less gracefully.

How do I know when the slit needs replacing?

Typical indicators include a gradual loss of mass resolution, drifting beam current or tune setpoints, increased particle counts, and difficulty re-qualifying dose uniformity. Visual inspection during maintenance windows will often reveal edge erosion, redeposition or cracking at the strike zone.

Does replacing the slit require retuning the beamline?

Yes. Because the slit defines the beam presented to the analyser, any replacement should be followed by source and analyser retuning and a qualification of mass resolution, beam current and dose uniformity before the tool returns to production.

What is the lead time for this part?

The indicative lead time is approximately 2.5 weeks. Because this slit is a predictable wear item, we recommend holding stock or arranging a min/max replenishment arrangement so a qualified replacement is always available for planned preventive maintenance.

Summary

The graphite pre-mass-resolving slit (OEM P/N 0020-85069, ESCT P/N ES227-0551) is a small but critical beam-defining aperture in the AMAT XR80 ion implanter beamline. Sitting just ahead of the analysing magnet, it trims the extracted ion beam to a controlled width and divergence, intercepts off-axis ions and protects downstream optics, all while contributing only carbon to a contamination-sensitive vacuum environment. Because it wears through edge erosion, redeposition and thermal cycling, its condition directly governs mass resolution, beam stability and dose uniformity, making it a key consumable to keep on hand. ESCT Fab Support offers this component as a verified, OEM-compatible replacement with predictable lead times to keep XR80-class implanters running reliably.

Disclaimer: This part is supplied by ESCT Fab Support as a new, OEM-compatible second-source component, verified to the form, fit and function of Applied Materials part number 0020-85069. It is not an original OEM part and is not sold as one. It is not manufactured by, endorsed by, or affiliated with Applied Materials, and all manufacturer names and part numbers are quoted for identification and compatibility purposes only.

REQUEST A QUOTE

Fill out the form below to request a quote for the part/s you require, making sure to include the OEM part number.

If the part you are looking for is not listed, get in touch and we will try to source it for you through our wide network of partners and suppliers.