10081164 - LINER SIDE, 0020-86738

PART DETAILS

0020-86738
10081164 - LINER SIDE, 0020-86738

OEM P/N: 

0020-86738

ESCT P/N: 

ES227-0083

PART TYPE:

2nd

OEM: 

AMAT
MORE INFO

Side liner (OEM P/N 0020-86738), high-purity beamline shielding liner for AMAT ion implanter systems

ESCT P/N ES227-0083 • compatible with Applied Materials (AMAT) ion implanter source and beamline hardware

The Side Liner, Applied Materials part number 0020-86738, is a sacrificial shielding component installed along the lateral walls of an AMAT ion implanter source or beamline enclosure. In an implanter, energetic ions, neutrals, sputtered metal and deposition by-products travel through tightly defined apertures and chambers under high vacuum. The side liner forms a removable inner skin that intercepts this flux before it reaches the structural housing, protecting expensive machined assemblies and confining contamination to a part that is designed to be consumed and replaced.

Positioned to flank the ion path on the side walls of the source or extraction region, the liner sees a punishing combination of ion bombardment, thermal loading, sputter erosion and chemical attack from process gases such as boron trifluoride, phosphine, arsine and their dissociation products. Because it is the surface most directly exposed to off-axis ions and back-streamed material, it accumulates the deposits and damage that would otherwise foul the chamber itself. This makes the side liner one of the more frequently serviced items in the source and beamline preventive maintenance cycle.

Its apparent simplicity belies its importance. A liner that is correctly specified, cleanly machined and properly seated keeps the surrounding electric fields, gas conductance and thermal behaviour stable. A degraded, mis-fitted or contaminated liner can shift beam geometry, generate particles and seed electrical instability, so its condition has a direct bearing on implant uniformity and tool uptime.

Functional role of the side liner in AMAT ion implanter platforms

The side liner is a passive but actively managed barrier. Its job is to absorb the consequences of high-energy operation so that the permanent hardware around it remains clean, dimensionally stable and electrically predictable across many production cycles.

  • Shields the side walls of the source or beamline housing from direct ion impact, sputtered metal and process deposits.
  • Confines erosion and contamination to a low-cost, replaceable surface, preserving the costly machined chamber underneath.
  • Helps define the local geometry and clearances that the ion beam and extraction fields see along the lateral boundary.
  • Manages secondary electron emission and surface charging at the chamber walls, supporting stable arc and beam conditions.
  • Contributes to thermal management by tolerating radiant and conductive heat without distorting the surrounding structure.
  • Provides a defined, repeatable interface that allows fast cleaning or swap-out during scheduled source and beamline maintenance.

Material and process performance

As a consumable that lives directly in the ion flux, the side liner must be made from materials that survive sputtering, thermal cycling and aggressive chemistry without releasing contamination into the beam. High-purity graphite and refractory metals are the typical choices for liners of this class, selected for their sputter behaviour, vacuum compatibility and resistance to the dopant chemistries used in implantation.

High-purity, low-outgassing construction

Liner material is held to tight purity limits so that, as it slowly erodes, it does not introduce metallic or particulate contamination that could be implanted alongside the intended dopant. Low outgassing holds the deep vacuum the beamline requires, and a dense, fine-grained structure resists the micro-cracking and flaking that generate particles.

  • High-purity feedstock to minimise cross-contamination of the implant species.
  • Low outgassing rate to protect chamber base pressure and pump-down times.
  • Dense, fine-grained structure that resists particle shedding under erosion.
  • Chemical resistance to fluorine- and hydride-based dopant gases and their by-products.

Thermal and sputter endurance

Sustained ion bombardment deposits substantial energy into the liner surface. The material must hold its form through repeated heating and cooling without warping, cracking or losing dimensional control over the apertures and clearances it defines. Predictable, even sputter erosion extends service life and keeps the surface geometry stable for as long as possible.

  • High thermal stability to resist distortion under radiant and ion heating.
  • Low thermal expansion to maintain clearances during heat-up and cool-down.
  • Uniform sputter erosion that preserves geometry over the service interval.
  • Machined surfaces and edges that retain shape as material is gradually removed.

Impact on tool performance and yield

Although the side liner does not steer or measure the beam directly, its condition propagates through the entire implant process. A clean, well-fitted liner keeps the beamline stable and the wafers clean; a worn or contaminated one becomes a hidden source of defects and drift.

  • Stable wall geometry supports consistent beam transmission and dose uniformity across the wafer.
  • Effective shielding protects the structural chamber, deferring costly major-component replacement.
  • Low particle generation reduces wafer defectivity and yield loss from contamination events.
  • Predictable wear behaviour allows confident preventive-maintenance scheduling and fewer surprise stops.
  • Reduced flaking and arcing risk lowers the chance of unplanned downtime mid-production.

Common wear and failure modes

The side liner is engineered to wear, but the way it wears determines when it must be replaced. Recognising these modes during inspection helps maintenance teams pull a liner at the right time rather than reacting to a yield excursion.

Sputter erosion and thinning

Continuous ion impact slowly removes material from the exposed faces. Over time this thins the liner, rounds defining edges and can locally erode through, exposing the chamber wall the liner was meant to protect and shifting the local geometry the beam interacts with.

Deposit build-up and flaking

Sputtered metal and dopant residues accumulate as layers on the liner surface. As these films thicken and thermally cycle, they crack and flake, releasing particles into the beamline that can land on wafers or trigger arcing and electrical instability.

Thermal cracking and distortion

Repeated heating and cooling, combined with the embrittlement that comes from prolonged ion and chemical exposure, can crack or warp the liner. A distorted liner no longer seats correctly, may rub against adjacent hardware and can disturb the clearances and fields around it.

Installation and replacement guidance

The side liner is replaced during scheduled source or beamline preventive maintenance, when the system is vented and the relevant assembly is opened. Cleanliness and careful handling are critical, as fingerprints, dust and handling damage can all become contamination once the tool returns to vacuum. The following sequence outlines the typical approach; always follow the AMAT service procedure and site safety rules for the specific tool.

  • Isolate and vent the system, lock out energy sources, and allow the source and beamline to cool fully before access.
  • Open the relevant enclosure and document the existing liner orientation and seating before disturbing anything.
  • Remove the worn side liner, capturing any loose flakes or debris and inspecting the underlying wall for erosion damage.
  • Clean the mounting surfaces and adjacent hardware to the required standard, removing residual deposits and particles.
  • Handle the new liner with clean, lint-free gloves and fit it in the correct orientation, confirming a flush, secure seat.
  • Verify clearances to neighbouring components so there is no interference or contact that could cause rubbing or arcing.
  • Close the enclosure, pump down, and confirm base pressure and stable beam conditions before returning to production.

Spare parts strategy for AMAT ion implanter liners

Because liners are scheduled consumables, holding the right stock is a straightforward way to protect implanter availability. ESCT Fab Support supplies the side liner ES227-0083 as a form, fit and function compatible alternative to AMAT 0020-86738, helping fabs keep maintenance on schedule without long procurement waits.

  • Cross-referenced to OEM P/N 0020-86738 for confident identification and ordering.
  • Verified to form, fit and function so it drops into the existing maintenance routine.
  • Cost-effective consumable sourcing that reduces total cost of ownership on a frequently replaced item.
  • A typical lead time of around 2.5 weeks supports planned preventive-maintenance stocking.
  • Backed by ESCT’s focus on AMAT source and beamline hardware and responsive technical support.

Frequently asked questions

What does the side liner do in an AMAT ion implanter?

It acts as a removable, sacrificial shield along the side walls of the source or beamline, intercepting ions, sputtered metal and process deposits so the permanent chamber hardware stays clean, dimensionally stable and electrically predictable.

Is this an original AMAT part?

No. This is supplied as a new, OEM-compatible part cross-referenced to AMAT P/N 0020-86738 under ESCT P/N ES227-0083. It is verified to form, fit and function but is not an original OEM-branded component.

How often does a side liner need replacing?

Replacement interval depends on beam current, dopant chemistry and duty cycle. As a consumable in the ion flux it is typically inspected and changed during scheduled source or beamline preventive maintenance, with timing guided by observed erosion, deposit build-up and particle performance.

What are the signs that a liner should be changed?

Watch for visible thinning or erosion-through, heavy deposit layers that are beginning to flake, cracking or distortion, and process symptoms such as rising particle counts, beam instability or arcing. Any of these indicate the liner is no longer protecting the chamber effectively.

Why does liner material purity matter?

As the liner slowly erodes, traces of its material can enter the beam. High-purity, low-outgassing construction means this does not introduce unwanted metallic or particulate contamination into the implant or degrade the vacuum the beamline depends on.

What is the lead time for ES227-0083?

The typical lead time is around 2.5 weeks. Because the side liner is a planned consumable, many fabs hold it as buffer stock so that scheduled maintenance is never delayed waiting on a replacement.

Summary

The Side Liner (AMAT P/N 0020-86738, ESCT P/N ES227-0083) is a high-purity sacrificial shielding component for AMAT ion implanter source and beamline systems. Mounted along the side walls of the ion path, it absorbs ion bombardment, sputtered metal and process deposits to protect the structural chamber, maintain stable geometry and fields, and keep particle generation low. Built from high-purity, thermally stable material and managed as a scheduled consumable, it directly supports implant uniformity, wafer cleanliness and tool uptime. Sourced through ESCT Fab Support, it offers a verified, cost-effective way to keep preventive maintenance on schedule.

Disclaimer: This part is supplied by ESCT Fab Support as a new, OEM-compatible second-source component, verified to the form, fit and function of Applied Materials part number 0020-86738. It is not an original OEM part and is not sold as one. It is not manufactured by, endorsed by, or affiliated with Applied Materials, and all manufacturer names and part numbers are quoted for identification and compatibility purposes only.

REQUEST A QUOTE

Fill out the form below to request a quote for the part/s you require, making sure to include the OEM part number.

If the part you are looking for is not listed, get in touch and we will try to source it for you through our wide network of partners and suppliers.