OEM P/N:
ESCT P/N:
PART TYPE:
OEM:
The Large Weight Balance is a precision-machined balance mass with a nominal weight of 154 g, used within the moving and rotating mechanical assemblies of Applied Materials (AMAT) Quantum and xR-class ion implantation systems. Despite its modest size, a counterweight of this type plays a defined and important role: it offsets the static and dynamic moments created by an offset load, a swinging arm, a pivoting bracket, a rotating shaft, or a wafer-handling member, so that the assembly remains balanced about its axis of motion. By bringing the centre of mass close to the axis of rotation or travel, the balance mass keeps drive torque low, reduces vibration, and helps the servo or pneumatic actuator settle quickly and repeatably at its target position.
In an ion implanter, several subsystems depend on smooth, repeatable mechanical motion. The scan mechanism sweeps the wafer or the beam through a controlled path; load-lock and end-station handlers move wafers between atmospheric and vacuum environments; and various lids, shutters and Faraday assemblies pivot or translate during operation and maintenance. Wherever a member is cantilevered off its bearing or pivot, an unbalanced moment appears that the actuator must continuously fight. The 154 g Large Weight Balance is fitted to counter exactly that moment, so that the actuator only has to overcome friction and the commanded acceleration rather than a permanent gravitational bias.
Although it carries no electrical function, a counterweight is a calibrated component. Its mass is specified to a tolerance, its mounting interface is dimensioned to seat precisely, and its position relative to the pivot is part of the original mechanical design. Substituting an incorrect mass, or omitting it during a rebuild, changes the balance of the assembly and can introduce positioning error, accelerated wear and excess vibration. ESCT supplies this balance mass to the correct nominal weight and form so that the assembly behaves as the platform designers intended.
The Large Weight Balance performs a purely mechanical, but precisely defined, set of functions within the moving assemblies of the tool. Its job is to manage mass distribution so that motion control and structural loading remain within design limits.
A balance mass earns its place through dimensional and weight precision. The component is machined from a dense, dimensionally stable metal, typically a steel, stainless steel or brass alloy, so that the nominal 154 g is concentrated in a compact, predictable volume close to the mounting interface.
Beyond static balance, the counterweight governs how the assembly behaves in motion. With the moment correctly offset, the actuator works against a near-symmetrical load and the mechanism accelerates, decelerates and settles consistently from cycle to cycle.
In a tool where dose uniformity and wafer placement directly determine device yield, the mechanical condition of moving assemblies is not a background concern. A correctly balanced mechanism supports the precision that the rest of the implanter is built to deliver.
Repeated acceleration and reversal can work fasteners loose over time. A counterweight that shifts on its mount, or whose retaining hardware backs off, moves its effective moment arm and unbalances the assembly, producing increased vibration, audible knocking and creeping positioning error.
Mechanical handling, contact with adjacent surfaces and any exposure to moisture or process by-products can mar the mass or its mounting features. Worn or damaged seating faces prevent the part from locating repeatably, while corrosion can subtly alter surface condition and interfere with a clean, secure fit.
The most common functional failure is not the part wearing out but the wrong part being fitted. Omitting the counterweight during a rebuild, or substituting a mass of the wrong weight, leaves the assembly unbalanced, the actuator runs hot, settling degrades and the mechanism may fault under load.
Replacing the Large Weight Balance is a mechanical task that should follow the relevant AMAT service procedure for the specific subassembly. The outline below describes the general sequence; always work to the documented procedure for the tool and observe site safety practice.
Small mechanical components such as counterweights are easy to overlook in a spares plan, yet a missing or damaged balance mass can hold up a rebuild just as effectively as a major assembly. Stocking the correct part keeps planned maintenance on schedule and avoids improvised fixes that compromise motion accuracy. ESCT Fab Support helps fabs keep these parts on hand without long OEM lead times.
It is a counterweight: a calibrated 154 g mass fitted to a moving or rotating assembly to offset the moment created by an offset load. By balancing the mechanism about its axis, it lowers the drive torque required, reduces vibration and helps the actuator settle precisely and repeatably.
No. This is an OEM-compatible component supplied by ESCT Fab Support, not an original Applied Materials part. It is provided to match the form, fit and function of the original 154 g balance mass so it can be fitted directly in the same location.
Because the counterweight balances a specific moment in the assembly, its mass and position are part of the original design. A heavier or lighter substitute changes the balance, which can introduce positioning error, increase actuator loading and accelerate wear. Supplying the correct nominal weight preserves the intended behaviour.
It belongs to the moving and rotating mechanical assemblies of the implanter, the kind of cantilevered arms, pivots and shafts found in scan, handling and access mechanisms. The exact location depends on the specific subassembly; always confirm against the tool documentation before fitting.
Indirectly, yes. An unbalanced mechanism vibrates more, settles less precisely and loads its bearings unevenly. In a tool where wafer placement and scan geometry feed into dose uniformity, degraded motion can contribute to inconsistent results and to faults that interrupt production.
The current indicative lead time is approximately 1.5 months. Because lead times can vary with demand, we recommend confirming availability with ESCT Fab Support at the time of order, particularly when the part is needed for a scheduled maintenance window.
The Large Weight Balance (154 g), ESCT P/N ES3033-099, is a precision counterweight for the moving and rotating assemblies of AMAT Quantum and xR-class ion implanters. It offsets the moment of an offset load, lowering drive torque, reducing vibration and supporting the repeatable motion on which wafer positioning and dose uniformity depend. Though small and mechanically simple, it is a calibrated part whose mass and placement matter; fitting the correct component keeps the assembly balanced and the actuator within its design envelope. ESCT supplies it to the correct form, fit and function with a typical lead time of around 1.5 months, helping fabs keep maintenance on schedule without extended OEM delays.
Disclaimer: This part is supplied by ESCT Fab Support as a new, OEM-compatible second-source component, verified to the form, fit and function of the referenced Applied Materials part. It is not an original OEM part and is not sold as one. It is not manufactured by, endorsed by, or affiliated with Applied Materials, and all manufacturer names and part numbers are quoted for identification and compatibility purposes only.
Fill out the form below to request a quote for the part/s you require, making sure to include the OEM part number.
If the part you are looking for is not listed, get in touch and we will try to source it for you through our wide network of partners and suppliers.
We use cookies We use analytics cookies to see how visitors use this site, so we can improve it. They are set only if you accept. Read our Cookie Policy.